Finished

 

Well not really. There just wasn't enough time. I still have to install the handles, and put up the trim. I'm going with hunter green trim. Then I have to finish the baseboards. And touch up the Tung oil on the cabinet doors in some places. Still got a lot to do. Have to do something about the walls and replacing the window on the North wall.

 

F kitchen  left 016.jpg (723318 bytes)Left. Note the new floor and the backsplash

F kitchen center 017.jpg (855301 bytes)Center

F kitchen Right 018.jpg (1011866 bytes)Right

F Kitchen floor  019.jpg (787042 bytes) Better look at the floor

F kitchen NW  021.jpg (956824 bytes)North wall details.

Better look at the countertop and the backsplash.

F kitchen  splash 020.jpg (685112 bytes)Backsplash details

kitchen 036.jpg (638628 bytes)Lighting details

handle 030.jpg (811722 bytes)Handles that we are using.

kitchen 035.jpg (681731 bytes)Her new entertainment center.

sink 032.jpg (929753 bytes)Sink detail

   

Page 1

Page 2 Before

Page 3 Work in progress

Lewis Saddle Shop

 

Dallas Tieking (owner)
Copyright © 2006 Lewis Saddle Shop. All rights reserved.
Revised: June 17, 2008.

Thanks for stopping by

my art

Kitchen

Kittens

Hall Build